The kitchen as was washing machine to the left of what was the door cooker in the corner then a string of units. All taken out.
Swapped pipework round hot and cold water pipes had to cross over the gas pipe and the cold water had to branch off to feed the washer which is now on the back wall.
The gas pipe had to be extended to fit the new position of the cooker. End of day one.
The taps are not connected yet but our Stuart couldn't wait to see what they would look like.
I'm pleased how the job is going steady work no rush.
How the job looks so far after two days. End of day two.
Today I've fitted the waste pipe and trap, and connected the water pipes up.
The plumbing part of the job is finished, units and worktop on far wall to do.
One last check to see that all is dry it was only an hours job today yesterday it would have been an hour too long.
Left the putting on of the cupboard doors for our Stuart to do.
The trimming of the work surface was left for me to do.
Stuart also built up the drawers for the drawer unit, one more drawer to build.
He is working all week so he just does a little at a time when he comes home.
Job so far, things to do:- wall tiles, wall units, kick boards and floor covering tiles or cushion flooring or wood???? That is up to him I'm always available choose which.
Not finished yet but well on the way.